Blank

Complete 1st floor remodel including 1 bathroom, removal of many walls, incl. 1 supporting wall, moving kitchen, replumbing main boiler moving hat water heat register and repiping, removing original front door widening it almost 3ft, and moving header up 2ft and installing a 200 year old castle door from Argentina the door had to be taken apart I had to shrink the door by cutting in many different places, new electrical service, rewire entire house restore original hardwood floors, remodeling the foyer, foyer used to be the entrance into a 4 unit apartment building, separating walls had to be taken down, take the entire staircase apart and rebuilt it with the original parts restore a stained-glass window 3 x7ft by the staircase

Original Denver Square, 1997

Complete 1st floor remodel including 1 bathroom, removal of many walls, incl. 1 supporting wall, moving kitchen, replumbing main boiler moving hat water heat register and repiping, removing original front door widening it almost 3ft, and moving header up 2ft and installing a 200 year old castle door from Argentina the door had to be taken apart I had to shrink the door by cutting in many different places, new electrical service, rewire entire house restore original hardwood floors, remodeling the foyer, foyer used to be the entrance into a 4 unit apartment building, separating walls had to be taken down, take the entire staircase apart and rebuilt it with the original parts restore a stained-glass window 3 x7ft by the staircase

No comments yet.

Leave a Reply